FH: Parking and Circulation

This project includes pedestrian, bicycle and vehicular circulation improvements throughout the outer campus. Specific areas of improvement under construction include: PE Access Road Widening, Lot 2/3, PSEC Threshold and Lot 4B. Areas of improvement still under design are Lots 1, 5 and 6.

written by

The author didn‘t add any Information to his profile yet.

Comments are closed.

Leave a Reply

Want to join the discussion?
Feel free to contribute!