FH: Parking and Circulation (Phase 2)

This project includes pedestrian, bicycle and vehicular circulation improvements throughout the outer campus. Specific areas of improvement under construction include:

Phase 1: Lot 2/3, Lot 4B, Bus Stop, PE Access Road

Phase 2: Lot 1, Lot 6, District Access Road, Lot 1C, vehicle & pedestrian bridge, and traffic signal on loop road at Lot 1

Phase 3: Lot 1 Stairs and Natural Gas Pipeline Relocation

Information as of 6/10/14