Completion Date: January 2013
Project Budget: $58,315,002
Completion Date: July 2012 | Project Budget: $50,017,157
The Media & Learning Center is the second LEED Platinum building at De Anza after the Kirsch Center for Environmental Studies. Key features include a buoyancy-driven air circulation system that uses chilled and heated water located in the air intake shafts and under the floors to circulate air, and louvers in the atrium to exhaust the air; a design that minimizes electricity consumption by using daylight from the central skylight and southern and northern windows, and controls to dim or turn off lights next to windows during the day; heat absorption tubes to provide heated water to the building's air circulation and hot water systems and to heat the hydronic piping in the atrium floor during cooler weather; and roof-top photovoltaics for power generation to offset purchased PG&E power.
Completion Date: December 2013
Project Budget: $11,721,797
Completion Date: December 2012 | Project Budget: $998,245
The G Building Project consisted of selective interior and exterior renovation. Work included repairing the concrete structure; furnishing and installing a metal roofing system; and removing the existing stucco finish with asbestos-containing mastic underlayment and replacing it with a new plaster system. Replacements also included interior floor finishes, door hardware, window coverings and damaged ceiling tiles. Restroom renovations included replacing ceramic tile, new toilet accessories and paint. All interior and exterior canopies were painted.
Completion Date: September 2013 | Project Budget: $9,912,692
The newly renovated courtyard next to the Biology Division office includes a diverse array of planting and a new concrete pond filled with aquatic plants. The new pond replaces the old pond, which was a safety hazard. The pond is used in biology classes as part of the academic program to teach students about the aquatic ecology. The courtyard surrounding the pond allows disabled access to the pond. It includes additional bench seating to promote collaboration and a memorial ginkgo tree.
Completion Date: February 2013 | Project Budget: $7,811,753
The new Stadium Project was designed and built to provide an all-weather multipurpose football/soccer field and to provide a nine-lane synthetic track and adjacent natural grass areas for a full complement of NCAA track and field events. Those include the full range of throwing events (javelin, discus, shot put, and hammer throw), a full range of running events (sprints, distances and steeple chase), and a full range of jumping events (high jump, long jump, and pole vault).
Estimated Completion Date: September 2014
Project Budget: $14,965,944
Completion Date: September 2013
Project Budget: $5,443,350
Completion Date: March 2012 | Project Budget: $4,912,217
Replacement of existing heating, ventilation and air conditioning (HVAC) equipment.
Completion Date: October 2012 | Project Budget: $10,583,070
The cost of power is offset by operating the photovoltaics in Lots A & B. The savings equate to approximately $300,000 per year. The estimated rebate the college will receive from PG&E for the established five-year term is $1.6 million.
Estimated Completion Date: June 2022
Project Budget: $3,034,102
*Multimedia refresh refers to the adoption of newer technology to meet changing needs or to mitigate the risk of obsolescence of existing technology.
Estimated Completion Date: June 2022
Project Budget: $2,116,816
*Multimedia refresh refers to the adoption of newer technology to meet changing needs or to mitigate the risk of obsolescence of existing technology.