Foothill-De Anza Community College District

New District Office Building

Est. Completion Date: December 2017 | Measure C Budget: $4,000,000 (Project Budget as of 6/30/15: $20M)
The New District Offices will house administrative offices and the board room for the district. The project will be primarily funded by Measure C, supplemented by other funding sources. Design work began in 2014-15.

Foothill College: Library and Learning Resources Center Renovation

Est. Completion Date: August 2016 | Project Budget: $14,555,780
This project includes the renovation of Buildings 3500 and 3600 to accommodate new programmatic requirements, replacement of HVAC and electrical systems, seismic upgrades, and roofing repairs.

Foothill College: Parking and Circulation

Completion Date: December 2015 | Project Budget: $13,152,225
This project includes pedestrian, bicycle and vehicular circulation improvements throughout the outer campus. Along with the increased mobility in the parking lots, significant improvements help balance utilization campuswide, eliminating the need to travel around the Loop Road by as much as 25 percent.

De Anza College: L7 Building

Est. Completion Date: September 2016 | Project Budget: $3,369,285
The L-7 Building project will provide new dedicated electrical feeds for both the data center and classrooms. It will replace the HVAC for the entire building, providing higher efficiency units as well as redundant cooling for the data center. A new Intermediate distribution frame room will be dedicated to the classrooms. The exterior of the building will be renovated with a new single-ply roof, new waterproofing for the tile roofs, new paint, new stucco, and new doors. ADA accessibility to the building will be updated. A new fire alarm system will be installed. The interior of the classrooms will be refreshed with new carpet, paint, wall covering, ceiling tiles, lighting, and upgraded AV components.

De Anza College: Library

Completion Date: September 2015 | Project Budget: $11,594,209
This project will include improved shelving, a voluntary structural upgrade for seismic safety, reworking of interior spaces to add group study rooms for enhanced student collaboration opportunities, and updating classrooms for multimedia/smart classroom capabilities.  Revised interior spaces will include new circulation and reference desks, reference and periodical shelving stacks, main entrance modification to reduce wind-tunnel effect, addition of a copy room and lounge area, and modifications to staff offices, break rooms, and conference rooms. This project also will include improvements of interior and exterior finishes, modification of the north side patio, and better ADA access to the main entry.

Education Center

Est. Completion Date: August 2016 | Project Budget: $41,500,000
This project includes the demolition of structures at the decommissioned Onizuka Air Force Station in Sunnyvale, CA and construction of a new education center. The Foothill College Sunnyvale Center will offer year-round programs and services, providing a hub for workforce training in new and emerging technologies in the Bay Area at the gateway to one of Silicon Valley's premier technology parks.